Travelers on SR 20 near Twisp will encounter slowdowns and delays from Sept. 8 to Sept. 10 between 7 p.m. and 6 a.m. while crews work on water lines, according to WSDOT. The work involves alternating one-lane, two-way traffic with flaggers and reduced speed limits. The closure is scheduled to end on Sept. 10 at 6 a.m.
SR 20 Water Line Work Causes Nightly Closures
🔊 Listen · narrated by Aiden
📄 Source: WSDOT — Highway Construction & Closures — https://wsdot.wa.gov/travel/road-construction
Checked against the public record6 of 6 claims · 100%
Every factual claim below was checked against the original public record. Source: original document ↗
- ✓Travelers on SR 20 near Twisp will encounter slowdowns and delays from Sept. 8 to Sept. 10“Travelers on SR 20 at milepost 202 near Twisp will encounter slowdowns and delays from Sept. 8 to Sept. 10, from 7 p.m. to 6 a.m. while crews work on water lines.”
- ✓The slowdowns and delays will occur between 7 p.m. and 6 a.m.“Travelers on SR 20 at milepost 202 near Twisp will encounter slowdowns and delays from Sept. 8 to Sept. 10, from 7 p.m. to 6 a.m. while crews work on water lines.”
- ✓The slowdowns and delays are due to crews working on water lines“Travelers on SR 20 at milepost 202 near Twisp will encounter slowdowns and delays from Sept. 8 to Sept. 10, from 7 p.m. to 6 a.m. while crews work on water lines.”
- ✓The work involves alternating one-lane, two-way traffic with flaggers“Travelers on SR 20 at milepost 202 near Twisp will encounter slowdowns and delays from Sept. 8 to Sept. 10, from 7 p.m. to 6 a.m. while crews work on water lines. Expect alternating one-lane, two-way traffic with flaggers and reduced speed limits.”
- ✓The work involves reduced speed limits“Expect alternating one-lane, two-way traffic with flaggers and reduced speed limits.”
- ✓The closure is scheduled to end on Sept. 10 at 6 a.m.“Expected end: Sep 10, 2026, 6:00 AM”
The Okanogan Wire is free. Get Okanogan–Omak's news delivered every morning.