Pavement repairs on State Route 20 near Loup Loup Pass will continue until 8 p.m. Friday, Aug. 27, with alternating, one-lane, two-way traffic and reduced speed limits. The work is scheduled for Mondays through Thursdays from 6 a.m. to 8 p.m.
Residents and travelers should expect delays during these hours. The Washington State Department of Transportation (WSDOT) says temporary rumble strips and automatic flaggers will be used during the repairs. The project is part of routine maintenance to ensure safe travel conditions on the highway.
WSDOT notes the work will end on Friday, Aug. 27, at 8 p.m. No further updates are expected for this segment of SR 20 after that date.